There is a massive ECG operation going on at the moment.Old meters are being replaced with new prepaid ones.A complete nightmare.Most of the meters they fixed are either faulty themselves or have a faulty wiring to the mains.Ours is possessed and goes mental every night from 10pm;on and off, and off and on ... GRRHHH.
problems in transmission (they could be doing routine maintenance)... in the power plant, transmission plant/ lines...
ReplyDeleteSituation normal?
ReplyDeleteThere is a massive ECG operation going on at the moment.Old meters are being replaced with new prepaid ones.A complete nightmare.Most of the meters they fixed are either faulty themselves or have a faulty wiring to the mains.Ours is possessed and goes mental every night from 10pm;on and off, and off and on ... GRRHHH.
ReplyDeletelol what a waste of money
ReplyDelete